Hyperion

 

156' Sailing Yacht Hyperion - Page 14

The channel slots for the anchor casing. This had to be completed before we attached the tow rails / bulwarks.

bow84.jpg (24847 bytes)


Side view of anchor laying in glide! bow86.jpg (25550 bytes)


The 1/32 plywood will be glued down after the topsides get the finished paint job and the anchors connected around the windlass and into the chain locker bin hole. The final planking will cover all this in the end.


Page 1 | Page 2 | Page 3 | Page 4 | Page 5 | Page 6 | Page 7

Page 8 | Page 9 | Page 10 | Page 11 | Page 12 | Page 13 | Page 14

Page 15 | Page 16 | Page 17 | Page 18 | Page 19 | Page 20 | Page 21

Page 22 | Page 23 | Page 24 | Page 25 | Page 26 | Page 27 | Page 28